Seneca Posted October 31, 2019 Share Posted October 31, 2019 I would like to congratulate the Affinity Team on the latest implementation of Master Pages and how you handle migrations. Earlier I had to manually relink text boxes each time I changed a master page of a given page or a spread but not any more. I created a document with 4 independent stories running across each master page and the text boxes on each page were relinked automatically. In other words the links with the previous spread and the consecutive spread were not broken. This also applies to spreads with mixed master pages. That wasn't the case before. Love it. 000, Jon P and AdamW 1 2 2017 27” iMac 4.2 GHz Quad-Core Intel Core i7 • Radeon Pr 580 8GB • 64GB • Ventura 13.6.4. iPad Pro (10.5-inch) • 256GB • Version 16.4 Link to comment Share on other sites More sharing options...
Recommended Posts