Jump to content
You must now use your email address to sign in [click for more info] ×

Connecting 2 or more separate lines


Recommended Posts

  • Staff

Hi M4RCK3

With both curves selected, go to the Node Tool and press Join Curves from the Action section in the context toolbar. Affinity will connect the closest end points of the lines. Currently it's not possible to select the which nodes are used to perform the connection. This will be improved soon.

 

Another way to go about this is to select both curves and drag one of the end nodes of a curve over the other in the remaining curve. Make sure Snap to selected curves is enabled in the Snap section of the context toolbar and then press Join Curves.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...

Important Information

Terms of Use | Privacy Policy | Guidelines | We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.