Jump to content

AlanM04

New Members
  • Content count

    2
  • Joined

  • Last visited

  1. Tried this but doesn't make a difference, the pdf date/time stamp is still mm/dd/yy. Thanks for your reply by the system is set to London, UK BST so it's not that.
  2. Hi, When I export a job to PDF, the date/time stamp in the top right corner is in US mm/dd/yy format. Can't immediately see if this can be changed anywhere to UK dd/mm/yy format. Any ideas? TIA
×