entlein Posted May 7, 2019 Posted May 7, 2019 Dear advanced Affinity folks, I could not get this to work: I want to combine two curves. When I join the paths (with the respective action in the context menu) it always joins those two ends that were predetermined by the order in which I drew the nodes initially. I want to connect the other open ends, though. Is this the way it is or is there a workaround? Secondly, I do not seem to be able to continue closing a path once I interrupted the drawing process. Quote
R C-R Posted May 7, 2019 Posted May 7, 2019 The Join Curves action connects the two nearest nodes of whatever open paths you have selected, one from each path. It doesn't have anything to do with the drawing order of the paths, their winding direction, or which nodes might be selected in each path. Once a number of curves have been joined into one curve (so there is just one red node), to connect the remaining pair of open ends, use the Close Curve action. Quote All 3 1.10.8, & all 3 V2.6 Mac apps; 2020 iMac 27"; 3.8GHz i7, Radeon Pro 5700, 32GB RAM; macOS 10.15.7 All 3 V2 apps for iPad; 6th Generation iPad 32 GB; Apple Pencil; iPadOS 15.7
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.