MikeTO Posted May 22, 2023 Share Posted May 22, 2023 I know there are several threads in the v1 archive on this topic such as the ones below but here's a fresh v2 one. I want to be able to drag slices in the Slices panel of the Export persona to re-order them. I'm considering deleting all my slices and starting over now that I've discovered I can't reorder them. I want them in a logical order and not in the order I created them in. D.VE 1 Quote Download a free manual for Publisher 2.3 from this forum - expanded 260-page PDF Affinity 2.3.1 for macOS Sonoma 14.3, MacBook Pro 14" (M1 Pro) Link to comment Share on other sites More sharing options...
lord darkul Posted May 23, 2023 Share Posted May 23, 2023 Hm, a bit sad that there was never a change to that since the 2015 request. Would really be nice to have both features. Quote Link to comment Share on other sites More sharing options...
Return Posted May 23, 2023 Share Posted May 23, 2023 Strangest thing is that the arrange buttons are present but not working. Quote Win11Pro/64gbRam/RTX3060Ti + Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050 Link to comment Share on other sites More sharing options...
Pšenda Posted May 23, 2023 Share Posted May 23, 2023 1 hour ago, Return said: Strangest thing is that the arrange buttons are present but not working. ? After click Move Forward One Quote Affinity Store (MSI/EXE): Affinity Suite (ADe, APh, APu) 2.3.1.2217 Dell OptiPlex 7060, i5-8500 3.00 GHz, 16 GB, Intel UHD Graphics 630, Dell P2417H 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506. Dell Latitude E5570, i5-6440HQ 2.60 GHz, 8 GB, Intel HD Graphics 530, 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506. Intel NUC5PGYH, Pentium N3700 2.40 GHz, 8 GB, Intel HD Graphics, EIZO EV2456 1920 x 1200, Windows 10 Pro, Version 21H1, Build 19043.2130. Link to comment Share on other sites More sharing options...
Return Posted May 23, 2023 Share Posted May 23, 2023 Uhm, even more strange as you can see from my screengrab I am selecting the lowest item in the slices panel and don't get the arrange options becoming available. Quote Win11Pro/64gbRam/RTX3060Ti + Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050 Link to comment Share on other sites More sharing options...
Pšenda Posted May 23, 2023 Share Posted May 23, 2023 (edited) 23 minutes ago, Return said: don't get the arrange options becoming available. ADesigner Version? Edit: Create Slice with Layers panel + Create Slice? Ordering don't work. Create Slice with Slice Tool? Ordering work. Your slice vs my slice. vs Edit2: first created slice must be via Slice tool! Edited May 23, 2023 by Pšenda Quote Affinity Store (MSI/EXE): Affinity Suite (ADe, APh, APu) 2.3.1.2217 Dell OptiPlex 7060, i5-8500 3.00 GHz, 16 GB, Intel UHD Graphics 630, Dell P2417H 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506. Dell Latitude E5570, i5-6440HQ 2.60 GHz, 8 GB, Intel HD Graphics 530, 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506. Intel NUC5PGYH, Pentium N3700 2.40 GHz, 8 GB, Intel HD Graphics, EIZO EV2456 1920 x 1200, Windows 10 Pro, Version 21H1, Build 19043.2130. Link to comment Share on other sites More sharing options...
Return Posted May 23, 2023 Share Posted May 23, 2023 33 minutes ago, Pšenda said: Edit2: first created slice must be via Slice tool! You're right, when creating a slice manually with the slicetool, which I don't use, it works. But it should also be working with layers to slices. This is a bug in my opinion. GripsholmLion, bures and D.VE 3 Quote Win11Pro/64gbRam/RTX3060Ti + Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050 Link to comment Share on other sites More sharing options...
lord darkul Posted May 23, 2023 Share Posted May 23, 2023 Drag and Drop to change the order despite of how slices are created should be working. D.VE 1 Quote Link to comment Share on other sites More sharing options...
Return Posted May 23, 2023 Share Posted May 23, 2023 3 minutes ago, lord darkul said: Drag and Drop to change the order despite of how slices are created should be working. You mean should also be working. D.VE 1 Quote Win11Pro/64gbRam/RTX3060Ti + Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050 Link to comment Share on other sites More sharing options...
MikeTO Posted May 23, 2023 Author Share Posted May 23, 2023 Thanks, I've never used the Arrange buttons so I didn't notice them there and I wouldn't have thought they'd apply to slices anyway, I'd have assumed they would be for layers. But that's one problem solved. We really should be able to reorder them with the Slices panel but given there is a way to do it this would be lower priority. Quote Download a free manual for Publisher 2.3 from this forum - expanded 260-page PDF Affinity 2.3.1 for macOS Sonoma 14.3, MacBook Pro 14" (M1 Pro) Link to comment Share on other sites More sharing options...
Return Posted May 23, 2023 Share Posted May 23, 2023 2 minutes ago, MikeTO said: We really should be able to reorder them with the Slices panel but given there is a way to do it this would be lower priority. It's imo the same action in the code. Meaning both layers and slices should be able to drag/drop in its respected layers and move to a position through arrange menu and/or buttons Quote Win11Pro/64gbRam/RTX3060Ti + Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050 Link to comment Share on other sites More sharing options...
Pšenda Posted May 23, 2023 Share Posted May 23, 2023 9 minutes ago, Return said: It's imo the same action in the code. Likewise, doubleclicking on a slice thumbnail should adjust/enlarge its display. Return 1 Quote Affinity Store (MSI/EXE): Affinity Suite (ADe, APh, APu) 2.3.1.2217 Dell OptiPlex 7060, i5-8500 3.00 GHz, 16 GB, Intel UHD Graphics 630, Dell P2417H 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506. Dell Latitude E5570, i5-6440HQ 2.60 GHz, 8 GB, Intel HD Graphics 530, 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506. Intel NUC5PGYH, Pentium N3700 2.40 GHz, 8 GB, Intel HD Graphics, EIZO EV2456 1920 x 1200, Windows 10 Pro, Version 21H1, Build 19043.2130. Link to comment Share on other sites More sharing options...
D.VE Posted August 8, 2023 Share Posted August 8, 2023 Another vote for this... Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.