Jump to content
You must now use your email address to sign in [click for more info] ×

Change order of slices


Recommended Posts

I know there are several threads in the v1 archive on this topic such as the ones below but here's a fresh v2 one.

I want to be able to drag slices in the Slices panel of the Export persona to re-order them. I'm considering deleting all my slices and starting over now that I've discovered I can't reorder them. I want them in a logical order and not in the order I created them in.

 

Download a free manual for Publisher 2.3 from this forum - expanded 260-page PDF

Affinity 2.3.1 for macOS Sonoma 14.3, MacBook Pro 14" (M1 Pro)

 

Link to comment
Share on other sites

1 hour ago, Return said:

Strangest thing is that the arrange buttons are present but not working.

?
image.png.780a8c79aaa7ea6d269484956c4f9aea.png

After click Move Forward One
image.png.af914920af9a82c97d0ca03b63fda84e.png

Affinity Store (MSI/EXE): Affinity Suite (ADe, APh, APu) 2.3.1.2217
Dell OptiPlex 7060, i5-8500 3.00 GHz, 16 GB, Intel UHD Graphics 630, Dell P2417H 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506.
Dell Latitude E5570, i5-6440HQ 2.60 GHz, 8 GB, Intel HD Graphics 530, 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506.
Intel NUC5PGYH, Pentium N3700 2.40 GHz, 8 GB, Intel HD Graphics, EIZO EV2456 1920 x 1200, Windows 10 Pro, Version 21H1, Build 19043.2130.

Link to comment
Share on other sites

Uhm, even more strange as you can see from my screengrab I am selecting the lowest item in the slices panel and don't get the arrange options becoming available.

Win11Pro/64gbRam/RTX3060Ti  +  Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050


 

Link to comment
Share on other sites

23 minutes ago, Return said:

don't get the arrange options becoming available.

ADesigner Version?

Edit:

Create Slice with Layers panel + Create Slice? Ordering don't work.
Create Slice with Slice Tool? Ordering work.

Your slice vs my slice.

image.png.3f8677667446991a90befa6d411a5b6e.png vs image.png.94e676d8dfd649e33534594f44900e84.png

 

Edit2: first created slice must be via Slice tool!

Edited by Pšenda

Affinity Store (MSI/EXE): Affinity Suite (ADe, APh, APu) 2.3.1.2217
Dell OptiPlex 7060, i5-8500 3.00 GHz, 16 GB, Intel UHD Graphics 630, Dell P2417H 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506.
Dell Latitude E5570, i5-6440HQ 2.60 GHz, 8 GB, Intel HD Graphics 530, 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506.
Intel NUC5PGYH, Pentium N3700 2.40 GHz, 8 GB, Intel HD Graphics, EIZO EV2456 1920 x 1200, Windows 10 Pro, Version 21H1, Build 19043.2130.

Link to comment
Share on other sites

33 minutes ago, Pšenda said:

Edit2: first created slice must be via Slice tool!

You're right, when creating a slice manually with the slicetool, which I don't use, it works.
But it should also be working with layers to slices.
This is a bug in my opinion.

Win11Pro/64gbRam/RTX3060Ti  +  Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050


 

Link to comment
Share on other sites

Thanks, I've never used the Arrange buttons so I didn't notice them there and I wouldn't have thought they'd apply to slices anyway, I'd have assumed they would be for layers. But that's one problem solved. We really should be able to reorder them with the Slices panel but given there is a way to do it this would be lower priority.

Download a free manual for Publisher 2.3 from this forum - expanded 260-page PDF

Affinity 2.3.1 for macOS Sonoma 14.3, MacBook Pro 14" (M1 Pro)

 

Link to comment
Share on other sites

2 minutes ago, MikeTO said:

We really should be able to reorder them with the Slices panel but given there is a way to do it this would be lower priority.

It's imo the same action in the code.
Meaning both layers and slices should be able to drag/drop in its respected layers and move to a position through arrange menu and/or buttons

Win11Pro/64gbRam/RTX3060Ti  +  Win10Home/32gbRam/GTX1050Ti + Win11Home/16gbRam/RTX3050


 

Link to comment
Share on other sites

9 minutes ago, Return said:

It's imo the same action in the code.

Likewise, doubleclicking on a slice thumbnail should adjust/enlarge its display.

Affinity Store (MSI/EXE): Affinity Suite (ADe, APh, APu) 2.3.1.2217
Dell OptiPlex 7060, i5-8500 3.00 GHz, 16 GB, Intel UHD Graphics 630, Dell P2417H 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506.
Dell Latitude E5570, i5-6440HQ 2.60 GHz, 8 GB, Intel HD Graphics 530, 1920 x 1080, Windows 11 Pro, Version 23H2, Build 22631.2506.
Intel NUC5PGYH, Pentium N3700 2.40 GHz, 8 GB, Intel HD Graphics, EIZO EV2456 1920 x 1200, Windows 10 Pro, Version 21H1, Build 19043.2130.

Link to comment
Share on other sites

  • 2 months later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...

Important Information

Terms of Use | Privacy Policy | Guidelines | We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.