euronesia Posted October 31, 2022 Posted October 31, 2022 Hi, I noticed when working on several tabs in Designer and for instance I have embedded layer on my 2nd or 3rd tab, then I double click to edit the embedded layer, but when I'm done with editing embedded layer and close that edited tab, Designer always jumps back on showing the first Tab, not back to the master project tab which contains the embedded layer I just closed. Are there any settings I missed that can make Designer go back to the master tab that contains the embedded layer? Cheers.
Staff Callum Posted October 31, 2022 Staff Posted October 31, 2022 Hi Euronesia, This is currently by design I believe, this is something that might be improved in the future. Thanks C Please tag me using @ in your reply so I can be sure to respond ASAP.
euronesia Posted October 31, 2022 Author Posted October 31, 2022 14 minutes ago, Callum said: Hi Euronesia, This is currently by design I believe, this is something that might be improved in the future. Thanks C Thank you for the reply, Looking forward for Affinity new updates. 🙂 Cheers
Recommended Posts