Jump to content
THESE FORUMS ARE READ-ONLY: Please Read Me ×

Recommended Posts

Posted

Hi, 

I noticed when working on several tabs in Designer and for instance I have embedded layer on my 2nd or 3rd tab, then I double click to edit the embedded layer, but when I'm done with editing embedded layer and close that edited tab, Designer always jumps back on showing the first Tab, not back to the master project tab which contains the embedded layer I just closed.

Are there any settings I missed that can make Designer go back to the master tab that contains the embedded layer?

Cheers.

  • Staff
Posted

Hi Euronesia,

This is currently by design I believe, this is something that might be improved in the future.

Thanks
C

Please tag me using @ in your reply so I can be sure to respond ASAP.

Posted
14 minutes ago, Callum said:

Hi Euronesia,

This is currently by design I believe, this is something that might be improved in the future.

Thanks
C

Thank you for the reply,
Looking forward for Affinity new updates. 🙂

Cheers

×
×
  • Create New...

Important Information

Terms of Use | Privacy Policy | Guidelines | We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.